Purpose

Provides operator actions for responding to a partial loss of offsite power, where one or more (but not all) offsite power sources are lost. Includes guidance for evaluating remaining sources, re-energizing lost buses, and cross-tie operations.

Key Actions / Information

Scenario — 2020 #1
Loss of #4 SPT de-energizes 500 KV Bus Section 1 and 23 CW Bus. All Vital Buses remain energized from 24 SPT (single offsite source). Attachment 4 provides steps to re-energize 23 CW Bus from Bus Section 24 via cross-tie breaker 2CW2BD. Verify Bus Section 24 voltage is within 4.22-4.36 KV before closing cross-tie. CRS enters TS 3.8.1.1 Action C for one offsite source and one EDG inoperable.