S1.OP-SO.WG-0010 — Discharge of 13 Gas Decay Tank to Plant Vent
DRAFT — Reconstructed from exam materials
Purpose
Provides instructions for releasing radioactive waste gas from Unit 1 13 Waste Gas Decay Tank (WGDT) through the plant vent system. Covers Chemistry sampling and authorization, pre-release verification, CRS authorization, release initiation, monitoring, and termination.
Key Actions / Information
Pre-Release Verification (Attachment 1, Section 1.0)
Pre-Release verification in Attachment 1, Section 1.0 must be completed prior to CRS review for release authorization (before step 5.2.9).
Maximum Allowable Release Rate (Step 3.4)
Per NOTE in Step 3.4: tanks with a calculated maximum allowable release rate of <= 32 SCFM cannot be released. The rate must be > 32 SCFM.
CRS Authorization (Step 5.2.9)
CRS reviews all completed sections for accuracy and completeness before authorizing the gas release. Both the pre-release verification AND the calculated maximum allowable release rate must be satisfactory.