OP-AA-108-107-1002 — Salem and Hope Creek 500 KV Switchyard Operations Interface
Purpose
Administrative procedure governing the interface between Salem/Hope Creek operations and the 500 KV switchyard, including notification requirements to ESOC (Electric System Operation Center).
Key Requirements
- Per step 3.1.17, operations shift notifies ESOC when the generator Automatic Voltage Regulator (AVR) is NOT in Automatic mode
- Log the times when the station voltage regulation equipment is not in Automatic mode
- Also notifies the ER&T Generation Desk who will make appropriate notifications to PJM
- Per OHA H-27 ARP, 15 minute notification to ESOC is required
Exam History
- 2022 Q97 — AVR ESOC Notification: ESOC notification for AVR not in AUTO, 15-minute requirement
Connections
- Related systems: 500KV, Main Turbine
- Related procedures: OP-AA-108-107-1001 — Electric System Emergency Operations
- Related exam: 2022 NRC Written Exam