S2.OP-AR.ZZ-0004 — Alarm Response Procedure
Purpose
Alarm response procedure providing operator guidance for responding to control room annunciator alarms.
Key Actions / Information
Exam — 2023 Q1
OHA D-28 RCP BKR OPEN/FLO LO — if RCS flow degradation exists, trip the reactor, stop the RCP, and enter EOP-TRIP-1.
Connections
- Related systems: RCPs
- Related procedures: EOP-TRIP-1 — Reactor Trip or Safety Injection
- Related exam questions: 2023 Q1
- Related exam: 2023 NRC Written Exam