EOP-LOPA-4 — Extended Loss of All AC Power
Purpose
Provides operator actions for responding to an extended station blackout when AC power restoration cannot be expected within the SBO licensing basis coping time.
Key Actions / Information
Connections
- Related systems: DC Power, EDGs
- Related EOPs: EOP-LOPA-1 — Loss of All AC Power