OP-AA-108-107-1001 — Electric System Emergency Operations
Purpose
Administrative procedure governing Electric System Emergency Operations and Electric System Operator (ESO) Interface. Directs Station Load Curtailment actions when grid conditions require it.
Key Actions / Information
Exam — 2020 Q81
AB.GRID-0001 Attachment 3 directs initiating Station Load Curtailment IAW OP-AA-108-107-1001 when 500 KV Switchyard Voltage is < 493 KV on any line.
Connections
- Related systems: 500KV
- Related procedures: AB.GRID-0001 — Grid Disturbance, OP-AA-108-107-1002 — Salem and Hope Creek 500 KV Switchyard Operations Interface
- Related exam questions: 2020 Q81
- Related exam: 2020 NRC Written Exam