Technical Specifications Overview

⚠️ DRAFT

Technical Specifications Overview

Reference

UFSAR Chapter 16 states that the Technical Specifications exist as separate documents submitted on Docket Nos. 50-272 (Unit 1) and 50-311 (Unit 2). The complete Tech Specs are available as a separate document (ML11175A207). (UFSAR 16)

Tech Spec Structure

SectionTitleRelated Wiki Articles
1.0DefinitionsTS 1.0 — Definitions
2.0Safety Limits and LSSSTS 2.0 — Safety Limits and LSSS
3/4.0ApplicabilityTS 3/4.0 — Applicability
3/4.1Reactivity ControlTS 3/4.1.1 — Boration Control
3/4.2Power DistributionTS 3/4.2 — Power Distribution
3/4.3InstrumentationTS 3/4.3 — Instrumentation
3/4.4Reactor Coolant SystemTS 3/4.4 — Reactor Coolant System
3/4.5ECCSTS 3/4.5 — ECCS
3/4.6ContainmentTS 3/4.6 — Containment
3/4.7Plant SystemsTS 3/4.7 — Plant Systems
3/4.8ElectricalTS 3/4.8 — Electrical
3/4.9Refueling OperationsTS 3/4.9 — Refueling Operations
3/4.10Special Test ExceptionsTS 3/4.10 — Special Test Exceptions
3/4.11Radioactive EffluentsTS 3/4.11 — Radioactive Effluents
6.0Administrative ControlsTS 6.0 — Administrative Controls

Modes of Operation

ModeTitleReactivity (keff)% Rated PowerAverage Coolant Temp
1Power Operation≥0.99>5%N/A
2Startup≥0.99≤5%N/A
3Hot Standby<0.99N/A≥350°F
4Hot Shutdown<0.99N/A200°F ≤ Tavg < 350°F
5Cold Shutdown<0.99N/A<200°F
6RefuelingN/AN/AN/A

Note: Detailed Tech Spec articles will be populated during Phase 2 (Tech Spec ingestion).

Surveillance Procedure Conventions

Exam — 2020 Q71
Dollar sign ($) in surveillance procedures: Steps identified with a dollar sign ($) are those items required to meet Technical Specification acceptance criteria. Such steps, if not satisfactorily completed, may have reportability requirements and are to be brought to the immediate attention of the SM/CRS. This convention appears in the Precautions and Limitations section of all surveillance procedures. Trap: the $ does NOT identify UFSAR criteria, Independent Verification hold points, or Reactivity Management SRO oversight requirements.