EOPs > EOP-LOSC-1 — Loss of Secondary Coolant

EOP-LOSC-1 — Loss of Secondary Coolant

⚠️ DRAFT

EOP-LOSC-1 — Loss of Secondary Coolant

Purpose

Referenced in 2023 NRC Operating Exam simulator scenarios. Details to be backfilled from source documents.

Key Actions / Information

Exam — 2020 Q9
Referenced as 2-LOSC-1 for design bases MSLB + LOOP event. Containment cooling design bases configuration requires 3 CFCUs and 1 CS pump. With 2C 4KV Vital Bus lost and 21 CFCU failed independently, design bases are NOT met (only 22 & 24 CFCUs and 21 CS pump available).
Scenario — 2020 #3
Entered from EOP-TRIP-1 on 21 SG pressure dropping in uncontrolled manner (feedwater line break inside containment). MSLI previously initiated. PO closes/verifies closed: 21BF13, 21BF40, 21MS7, 21MS10, 21MS18, 21MS167, and 21GB4 to isolate faulted 21 SG (CT-17 Part 2). Trips and stops 23 AFW pump. Dispatches operator to close 21MS45. PO reports 21 SG is faulted, other SGs NOT depressurizing. RCS temperature rising — PO adjusts MS10s to stabilize. Transition to EOP-TRIP-3 when RCS subcooling >0 F, PZR level >11%, RCS pressure stable/rising.

Connections