S2.OP-SO.MS-0001 — Main Steam Warmup

⚠️ DRAFT

S2.OP-SO.MS-0001 — Main Steam Warmup

Purpose

Provides guidance for performing Main, Reheat, and Turbine Bypass steam system warmup, including preparation and sequencing of valve operations to prevent water hammer.

Key Actions / Information

Exam — 2018 Q16
21-24MS7 (Main Steam Loop Drain Valves) are opened BEFORE 21-24MS167 (MSIVs) to prevent pressurized steam from forcing residual water in the piping to cause water hammer on downstream components. MSIVs are opened when there is less than a MAXIMUM of 50 psid across each valve. Trap: 15 psig is used for other MS Header pressure steps in this procedure, not the MSIV opening criterion.