Purpose

Provides guidance for power operation on Salem Unit 2, including monitoring reactor power levels and taking corrective actions to maintain power within licensed limits.

Key Limits

ParameterValueSource
Maximum power level3459 MWt (100% RTP)S2.OP-IO.ZZ-0004
Exam — 2023 Q43
If an event causes reactor power to rise above 100% RTP (e.g., AFW turbine steam inlet valve failing open and injecting cold feedwater), the operator should reduce reactor power per S2.OP-IO.ZZ-0004 to prevent an overpower condition.