admin > OP-AP-300-1001 — PWR Control Rod Movement Requirements

OP-AP-300-1001 — PWR Control Rod Movement Requirements

⚠️ DRAFT

OP-AP-300-1001 — PWR Control Rod Movement Requirements

⚠️ DRAFT — Reconstructed from exam materials

Purpose

Provides requirements for manual control rod movements during non-transient conditions, including minimum communication requirements prior to rod manipulation.

Key Actions / Information

Exam — 2020 Q68
Per step 4.4.3, during non-transient conditions the RO shall STATE the selected control rod bank initial position, target control rod position, and the direction of movement just prior to manually manipulating control rods. The minimum required information is bank position/target/direction — NOT TAVG, NOT NIS power level, NOT expected number of steps.