Q55 — PZR Pressure Channel Fails High / PORV Logic
027 PZR PCS Malfunction-AK2.03 (2.6)
Given:
• Unit 2 is at 50% Reactor Power and stable
• PT-455 (Channel I PZR Pressure) is the controlling PZR Pressure channel
At time 22:00:00
• PT-455 (Channel I PZR Pressure) fails high
Which ONE of the following completes the statements below?
At 22:00:05, ___ is/are open.
• Unit 2 is at 50% Reactor Power and stable
• PT-455 (Channel I PZR Pressure) is the controlling PZR Pressure channel
At time 22:00:00
• PT-455 (Channel I PZR Pressure) fails high
Which ONE of the following completes the statements below?
At 22:00:05, ___ is/are open.
A. BOTH Power Relief Valves (2PR1 and 2PR2)
B. NO Power Relief Valves (2PR1 and 2PR2)
C. ONLY 2PR1
D. ONLY 2PR2
▶ Show Answer & Explanation
✓ B. Correct. 2PR1 and 2PR2 require 2 channels (PT-455/PT-457 or PT-456/PT-474) to read greater than 2335 psig for the PORV to open. Consequently, at 22:00:05 with ONLY PT-455 reading greater than 2335 psig (due to PT-455 failing high), NO Power Relief Valves (2PR1 and 2PR2) are open.
✗ A. Incorrect but plausible. The candidate could incorrectly conclude the PORVs open based on the master pressure controller. Consequently, when the controlling pressure channel fails (PT-455), the candidate would then incorrectly conclude that BOTH PORVs are open at 22:00:05.
✗ C. Incorrect but plausible. The candidate could correctly realize that operation of the PORVs is dependent on specific PZR Pressure Transmitters. However, the candidate could then incorrectly understand how the PORV open logic works and/or which pressure transmitters operate each specific PORV. This would cause the candidate to incorrectly conclude that ONLY 2PR1 or ONLY 2PR2 is open at 22:00:05.
✗ D. Incorrect but plausible. The candidate could correctly realize that operation of the PORVs is dependent on specific PZR Pressure Transmitters. However, the candidate could then incorrectly understand how the PORV open logic works and/or which pressure transmitters operate each specific PORV. This would cause the candidate to incorrectly conclude that ONLY 2PR1 or ONLY 2PR2 is open at 22:00:05.
Ref: NOS05PZRP&L-10 (Pressurizer Pressure and Level Control), Drawing 231357 (Units 1 & 2 Pressurizer 1PR1, 2PR1, 1PR2, 2PR2 Press. Power) | LO: NOS05PZRP&L-10 | Source: New | Cognitive: Higher
Connections
- Related systems: Pressurizer Level & Press Control
- Related exam: 2018 NRC Written Exam