Q68 — SG Tube Leak Letdown Reduction and SI Initiation
APE: 037 Steam Generator (S/G) Tube Leak-AA1.07 (3.1)
Given:
At time 11:00
• The crew is attempting to control PZR level in accordance with S2.OP-AB.SG-0001 (Steam Generator Tube Leak)
At time 11:02
• PZR level can NOT be maintained
• The crew has TRIPPED the Reactor and the Reactor Trip has been confirmed
In accordance with S2.OP-AB.SG-0001, which ONE of the following completes the statements below?
At 11:00, the crew will _(1)_ letdown.
At 11:02, the crew _(2)_ initiate a Safety Injection prior to transitioning to 2-EOP-TRIP-1 (Reactor Trip or Safety Injection).
At time 11:00
• The crew is attempting to control PZR level in accordance with S2.OP-AB.SG-0001 (Steam Generator Tube Leak)
At time 11:02
• PZR level can NOT be maintained
• The crew has TRIPPED the Reactor and the Reactor Trip has been confirmed
In accordance with S2.OP-AB.SG-0001, which ONE of the following completes the statements below?
At 11:00, the crew will _(1)_ letdown.
At 11:02, the crew _(2)_ initiate a Safety Injection prior to transitioning to 2-EOP-TRIP-1 (Reactor Trip or Safety Injection).
| (1) | (2) |
A. isolate / will
B. isolate / will NOT
C. reduce / will
D. reduce / will NOT
▶ Show Answer & Explanation
✓ C. Correct. For Part 1, IAW S2.OP-AB.SG-0001 Step 3.7, the crew will reduce letdown to minimum by ONLY placing 2CV3 (45 gpm ORIFICE) in service. For Part 2, IAW S2.OP-AB.SG-0001 Step 3.11, the crew will initiate a safety injection prior to going to 2-EOP-TRIP-1.
✗ A. Incorrect but plausible. For Part 1, the candidate could conclude that avoiding a safety injection and doing a controlled plant shutdown is preferable. Consequently, isolating letdown will give the crew the most margin to maintain PZR level and to prevent a safety injection. Consequently, the candidate could incorrectly conclude that S2.OP-AB.SG-0001 directs the crew to isolate letdown. Part 2 is correct.
✗ B. Incorrect but plausible. For Part 1, the candidate could conclude that avoiding a safety injection and doing a controlled plant shutdown is preferable. Consequently, isolating letdown will give the crew the most margin to maintain PZR level and to prevent a safety injection. Consequently, the candidate could incorrectly conclude that S2.OP-AB.SG-0001 directs the crew to isolate letdown. For Part 2, the candidate could incorrectly conclude that a manual safety injection is not required until the crew reaches 2-EOP-TRIP-1 Step 5 (is SI actuated or required).
✗ D. Incorrect but plausible. Part 1 is correct. For Part 2, the candidate could incorrectly conclude that a manual safety injection is not required until the crew reaches 2-EOP-TRIP-1 Step 5 (is SI actuated or required).
Ref: S2.OP-AB.SG-0001 (Steam Generator Tube Leak) | LO: NOS05ABSGTL-05 — Given a set of initial plant conditions, determine the appropriate abnormal procedure, describe the plant response to actions taken, and describe the final plant condition | Source: New | Cognitive: Lower
Connections
- Related systems: CVCS, Steam Generator & Blowdown
- Related procedures: AB.SG-0001 — Steam Generator Tube Leak
- Related EOPs: EOP-TRIP-1 — Reactor Trip or Safety Injection
- Related exam: 2018 NRC Written Exam