JPM IP-i — Locally Control Charging Flow IAW S2.OP-AB.CR-0001 In-Plant (RCA) | RO/SRO | APE 068 AA1.22 (4.0/4.3)
Location: In-Plant — Unit 2 RCA (Panel 216-1, Chg Pmps FL & PR Inst Pnl)
Time-Critical: No
Alternate Path: No
Estimated Time: 10 minutes

Initial Conditions:
- The Unit 2 Control Room has been evacuated in accordance with S2.OP-AB.CR-0001, Control Room Evacuation.
- A reactor trip from 100% was initiated prior to evacuating the Control Room.

Initiating Cue:
- You are directed to take local control of charging flow IAW S2.OP-AB.CR-0001, Control Room Evacuation, Attachment 5, starting at Step 8.0 (see attached page).
- Steps 1.0-7.0 of Attachment 5 have been completed.
Task Standard:
1. Locally controls Charging flow using hand air operator IAW S2.OP-AB.CR-0001
2. Correctly adjusts air operator to change charging flow to the desired flow of 70 gpm.
▶ Show Critical Steps & Key Actions
Step Critical Element Standard
8.0 TAKE control of 2CV55, Cent Chg Pmp Flow Cont Valve Proceeds to Unit 2 Panel 216-1, Chg Pmps FL & PR Inst Pnl.
8.1 RECORD the charging flow as indicated on 2FI-128A Records charging flow from 2FI-128A, Charging Pump Flow Indication (typically around 90 gpm).
8.2 * PLACE local E/P Bypass Line Selector Valve in Manual Locates local E/P Bypass Selector Valve and simulates rotating valve (clockwise) to MAN position.
8.3 Using the MANUAL hand air operator, ENSURE that the flow rate as noted in Step 8.1 is being maintained with 2CV55 Reads flowrate from 2FI-128A (labeled 2FT-128A on panel), Charging Pump Flow Indication, to ensure flow rate is maintained with 2CV55.
* Adjust charging flow using hand air operator to 70 gpm Simulates rotating hand air operator in the clockwise direction to RAISE air pressure to LOWER charging flow to 70 gpm. 2CV55 fails open on loss of air — raising air pressure closes the valve (lowers flow); decreasing air pressure opens the valve (raises flow).
Key Decision Point:
The discriminating step is the hand air operator adjustment — the applicant must understand that 2CV55 is a fail-open (air-to-close) valve. Rotating the hand air operator CLOCKWISE raises air pressure, which CLOSES the valve and LOWERS charging flow. If the applicant rotates counter-clockwise (lowering air pressure), flow increases instead of decreasing. The evaluator cue confirms: if rotated counter-clockwise, charging flow increases to 100 gpm.
Ref: S2.OP-AB.CR-0001 (R23) | Task: 1130070501 | K/A: APE 068 AA1.22 — Ability to operate and/or monitor the following as they apply to the Control Room Evacuation: Flow control valve for RCS charging header | Source: Modified | View JPM PDF