JPM IP-j — Start SBO Diesel Air Compressor IAW SC.OP-SO.CA-0001 In-Plant | RO/SRO | G2.1.23 (4.3/4.4)
Location: In-Plant — SBO Compressor Building (outside RCA, L-3 key if locked)
Time-Critical: No
Alternate Path: No
Estimated Time: 20 minutes

Initial Conditions:
- Both Salem Units have tripped due to a loss of off-site power.
- Equipment problems have resulted in NO Emergency Control Air Compressors (ECACs) running.

Initiating Cue:
- The Unit 2 CRS has directed you to start the Station Blackout Compressor (SBO) IAW SC.OP-SO.CA-0001, SBO Diesel Control Air Compressor, starting with Step 5.1.3 (see attached).
- Steps 5.1.1 and 5.1.2 are complete.
Task Standard:
Operator performs Steps 5.1.3 thru 5.1.16 of SC.OP-SO.CA-0001 correctly and in proper sequence to start the SBO Diesel Control Air Compressor.
▶ Show Critical Steps & Key Actions
Step Critical Element Standard
P&Ls Review Precautions and Limitations Operator reviews and signs P&Ls. P&L 3.1 requires hearing protection. P&L 3.10 is verified at the SBO.
5.1.3 OPEN both Engine intake louvers (located outside building on west wall) Locates louvers and demonstrates how to open.
5.1.4 OPEN 1CA1920, BLACKOUT AIR COMPRESSOR DRAIN VALVE, drain water, then CLOSE Locates 1CA1920 and simulates opening (counterclockwise). Drain cap must be removed.
5.1.5 OPEN 2FZSBO10, BATTERY CHARGER, breaker Locates 2FZSBO10 in Panel 2FZSBO, SBO Compressor Bldg Distribution Panel, and simulates opening.
5.1.6 PLACE SBO Control Air Dryer switch in ON position Locates switch and simulates turning to ON. Control Air On light illuminates.
5.1.7 RECORD Engine Hourmeter reading on Attachment 1 and in log book Locates Engine Hourmeter (1XA16993, Tachometer/Hourmeter) inside engine control panel and logbook on side of panel 2FZSBO.
5.1.8 PLACE UNLOADER VALVE selector switch in START position Locates UNLOADER VALVE selector switch and ensures in START position (normally in START when engine is shutdown).
5.1.9 * PRESS AND HOLD BY-PASS VALVE pushbutton Locates BY-PASS VALVE pushbutton in control panel and simulates depressing AND holding depressed.
5.1.10 * PLACE SBO-IGN-SWT, ENGINE IGNITION SWITCH in START until engine starts, then RELEASE to RUN While keeping BY-PASS VALVE pushbutton depressed, simulates placing SBO-IGN-SWT in START. After engine starts, releases to RUN. Must NOT release BY-PASS VALVE pushbutton until oil pressure is verified >15 psig in next step.
5.1.11 * When engine oil pressure is >15 psig, RELEASE BY-PASS VALVE pushbutton Identifies oil pressure reading on gauge inside control panel. After cue (40 psig), releases BY-PASS VALVE pushbutton. Releasing early (without checking oil pressure) causes the engine to stop.
5.1.12 ALLOW engine to run for 5 minutes to warm up N/A — wait for warm-up period.
5.1.13 * OPEN 1CA1913 SBO COMPRESSOR DISCHARGE VALVE to pressurize Control Air header Locates and simulates opening 1CA1913 (counterclockwise).
5.1.14 * OPEN 1CA1886, BLACKOUT AIR COMPRESSOR ISOLATION Locates and simulates opening 1CA1886 (counterclockwise). Located near entrance to Service Building past U2 mixing bottle.
5.1.15 * OPEN 2CA584, YARD CONTROL AIR SUPPLY VALVE to pressurize Aux. Building 1A and 2A Control Air headers Locates and simulates opening 2CA584 (counterclockwise). Located near entrance to Service Building past U2 mixing bottle.
5.1.16 * PLACE UNLOADER VALVE selector switch in RUN position Returns to SBO Compressor Building and places UNLOADER VALVE selector switch in RUN to load the compressor.
Key Decision Point:
Steps 5.1.10 and 5.1.11 are the discriminating steps — the applicant must keep the BY-PASS VALVE pushbutton depressed while starting the engine with SBO-IGN-SWT, then verify oil pressure >15 psig BEFORE releasing the bypass valve pushbutton. Releasing the bypass valve early (without checking oil pressure) causes the engine to stop, requiring a 5-minute cooldown before reattempting the start.
Ref: SC.OP-SO.CA-0001 (R14) | Task: N1150140501 | K/A: G2.1.23 — Ability to perform specific system and integrated plant procedures during all modes of operation | Source: Modified | View JPM PDF