Q13 — Loss of 2A 125 VDC Bus Equipment Impact
000058AA2.03 (3.5)
Given:
• Unit 2 is at 100% Reactor Power
At time 16:00
• OHA B-2, "2A 125 VDC CNTRL BUS VOLT LO" actuates
• 2A Vital 125 VDC Bus voltage is reading 0 VDC on 2RP9
Considering ONLY the following equipment malfunctions below:
1. #1 SGFP Emergency Oil Pump loses power
2. Main Turbine Emergency Oil Pump loses power
3. 2A EDG is NOT available for start
Which ONE of the following completes the statement below?
With a confirmed 2A Vital 125 VDC Bus voltage of 0 VDC, Unit 2 will experience equipment malfunction(s) ______.
• Unit 2 is at 100% Reactor Power
At time 16:00
• OHA B-2, "2A 125 VDC CNTRL BUS VOLT LO" actuates
• 2A Vital 125 VDC Bus voltage is reading 0 VDC on 2RP9
Considering ONLY the following equipment malfunctions below:
1. #1 SGFP Emergency Oil Pump loses power
2. Main Turbine Emergency Oil Pump loses power
3. 2A EDG is NOT available for start
Which ONE of the following completes the statement below?
With a confirmed 2A Vital 125 VDC Bus voltage of 0 VDC, Unit 2 will experience equipment malfunction(s) ______.
A. 3 ONLY
B. 2 ONLY
C. 1 and 2 ONLY
D. 2 and 3 ONLY
▶ Show Answer & Explanation
✓ A. Correct. When OHA B-2, "2A 125 VDC CNTRL BUS VOLT LO" actuates, the only affected malfunction is that 2A EDG is not available for start.
✗ B. Incorrect. All of the equipment malfunctions can be caused by a loss of a portion of the DC Power System (250 VDC, 125 VDC or 28 VDC). Consequently, all the distractors are plausible.
✗ C. Incorrect. All of the equipment malfunctions can be caused by a loss of a portion of the DC Power System (250 VDC, 125 VDC or 28 VDC). Consequently, all the distractors are plausible.
✗ D. Incorrect. All of the equipment malfunctions can be caused by a loss of a portion of the DC Power System (250 VDC, 125 VDC or 28 VDC). Consequently, all the distractors are plausible.
Ref: S2.OP-AR.ZZ-0002, Alarm B-2 | LO: NOS05DCELEC-09, ELO 14 | Source: Bank - Salem 2019 NRC Exam - Q59 | Cognitive: Comprehension/Analysis
Connections
- Related systems: DC Power, EDGs
- Related procedures: S2.OP-AR.ZZ-0002 — Overhead Annunciators Window B
- Related exam: 2020 NRC Written Exam