SALEM
SALEM STUDY SYSTEM
Exams > 2020 Q53 — SW Pump Trip / 1A 4KV Bus Differential

2020 Q53 — SW Pump Trip / 1A 4KV Bus Differential

⚠️ DRAFT
Q53 — SW Pump Trip / 1A 4KV Bus Differential 076000A2.01 (3.5)
Given:

Initial Conditions:
• Unit 1 is at 100% Power.
• #3 Service Water Bay is cleared and tagged (isolated) due to a leak on the 15SW3, 15 SW Pump Discharge Valve.
• The 1A EDG is running paralleled to the bus for a normally scheduled monthly surveillance.
• 11 and 13 SW Pumps are in service.
• 12 SW Pump is in AUTO.

Current Conditions:
• 13 SW Pump trips
• One minute later the 1A EDG output breaker opens due to 1A 4KV Vital Bus Differential.

Which ONE of the following describes the required mitigating actions for the event?
A. Enter S1.OP-AB.4KV-0001, Loss of 1A 4KV Vital Bus, and verify that 12 SW Pump has started and SW header pressure has returned to normal.
B. Enter S1.OP-AB.SW-0005, Loss of All Service Water, trip the Rx, confirm the trip, and stop the RCPs to limit heat input to the RCS.
C. Enter S1.OP-AB.SW-0005, Loss of All Service Water, trip the Rx, confirm the trip, and stop the RCPs to limit heat input to the CCW System.
D. Enter S1.OP-AB.SW-0004, Loss of Service Water During Service Water Header Outage, and verify that 12 SW Pump has started and SW header pressure has returned to normal.
▶ Show Answer & Explanation
✓ A. Correct. The trip of the 13 SW Pump will cause a reduction in SW header pressures and an automatic start of the 12 SW Pump (C Bus). The 1A Bus differential will not effect the service water system as 15 and 16 SW Pumps are powered from 1A Bus and they are already C/Ted for the #3 SW Bay Outage. This involves a unit difference knowledge of which buses power which pumps. (see step 3.33 of AB-4KV-0001)
✗ B. Plausible because the candidate may believe that 11 and 12 SW Pumps are powered from the 1A Bus, therefore resulting in a Loss of All Service Water, requiring entry in AB-SW-0005. They also may believe that the RCPs are tripped to limit heat input to the RCS (like in FRHS).
✗ C. Plausible because the candidate may believe that 11 and 12 SW Pumps are powered from the 1A Bus, therefore resulting in a Loss of All Service Water, requiring entry in AB-SW-0005. The remainder of the actions are correct if entry into AB-SW-005 was required.
✗ D. Plausible because the candidate may believe that S1.OP-AB.SW-0004(Q), Loss of Service Water During Service Water Header Outage is the appropriate procedure to enter due to the #3 SW Bay being C/Ted. AB-SW-0004 is for outage situations.
Ref: S1.OP-AB.SW-0001(Q), Loss of Service Water Header Pressure, S1.OP-AB.SW-0005(Q), Loss of All Service Water. S1.OP-AB.4KV-0001(Q), Loss of 1A 4KV Vital Bus. | LO: N/A | Source: New | Cognitive: Comprehension