Q67 — Shift Turnover Pre/Post Relief Actions G2.1.3 (3.7)
Which ONE of the following describes Reactor Operator pre and post-shift relief actions that should be implemented by the oncoming operator in accordance with OP-AA-112-101, Shift Turnover and Relief?
A. PRIOR to relief, read the Control Room logs through the last previous date on shift, or the preceding four (4) days logs, whichever is less.
POST relief, confer with the Control Room Supervisor to determine the scope of planned shift activities and their responsibilities for that shift.
B. PRIOR to relief, read the Control Room logs through the last previous date on shift, or the preceding four (4) days logs, whichever is less.
POST relief, tour the main control board back panels.
C. PRIOR to relief, read the Control Room logs through the last previous date on shift, or the preceding seven (7) days logs, whichever is less.
POST relief, tour the main control board back panels.
D. PRIOR to relief, read the Control Room logs through the last previous date on shift, or the preceding seven (7) days logs, whichever is less.
POST relief, confer with the Control Room Supervisor to determine the scope of planned shift activities and their responsibilities for that shift.
▶ Show Answer & Explanation
✓ A. Correct. IAW OP-AA-112-101, Shift Turnover and Relief, (step 4.8.3) prior to relief, the logs should be reviewed through the last previous date on shift or the proceeding four days, whichever is less and (step 4.8.4) after relief, the operator is to confer with the CRS to determine the planned activities & responsibilities for that shift.
✗ B. Incorrect. Plausible because the first part is correct, and the candidate may believe the back panels are walked down after taking the watch. Incorrect as touring the main control room back panel area is required prior to relief.
✗ C. Incorrect. Plausible because reading the logs is required prior to relief, but back to 7 days is incorrect. Plausible because the candidate may believe the back panels are walked down after taking the watch. Incorrect as touring the main control room back panel area is required prior to relief.
✗ D. Incorrect. Plausible because reading the logs is required prior to relief, but back to 7 days is incorrect. The second part is correct.
Ref: OP-AA-112-101, Shift Turnover and Relief | LO: N/A | Source: Modified Bank – Hope Creek 2105 NRC Exam – Q66 | Cognitive: Fundamental