Q82 — Fuel Handling Incident Mast Tube 000036G2.1.32 (4.0)
Given:

• Unit 2 is in MODE 6.
• The Containment Equipment Hatch is closed.
• Core Reload is in progress.
• The transfer cart is in the Fuel Handling Building.
• A fuel assembly in the mast tube is in transit approaching the core.
• Gas bubbles are observed in the vicinity of the fuel assembly last placed in the core.
• The Refueling SRO has ordered all fuel transfers in progress stopped and all non-essential personnel evacuated from the containment.

Based on the above conditions, complete the statement concerning the NEXT action taken in accordance with S2.OP-AB.FUEL-0001, Fuel Handling Incident:

The CRS will direct placing the fuel assembly in the mast tube_________.
A. in the upender and lower the upender to the horizontal position.
B. into the core in any location that takes the least amount of time.
C. into the core in the emergency location X-3.
D. into the core in its designated location or the emergency location P-10, whichever is closer.
▶ Show Answer & Explanation
✓ D. Correct. S2.OP-AB.FUEL-0001(Q), Fuel Handling Incident states; "Place the fuel assembly in the mast tube into the core in its designated location or the emergency location P-10 whichever is closer."
✗ A. Incorrect. Plausible because the upender in the horizontal position is a safe position for a fuel assembly IAW AB.FUEL, if P-10 is not available or the assembly is indexed above the upender.
✗ B. Incorrect. Plausible because the candidate may believe that any core location is safe at this point of the fuel reload.
✗ C. Incorrect. Plausible because the candidate may confuse the safe location in the FHB (X-3) with the one in Containment (P-10).
Ref: S2.OP-AB.FUEL-0001(Q), Fuel Handling Incident and bases | LO: N/A | Source: New | Cognitive: Fundamental