SALEM
SALEM STUDY SYSTEM
Exams > 2022 JPM IP-i — Transfer PZR Backup Heater to Emergency Power Supply

2022 JPM IP-i — Transfer PZR Backup Heater to Emergency Power Supply

⚠️ DRAFT
JPM IP-i — Transfer PZR Backup Heater to Emergency Power Supply In-Plant | RO/SRO | 010 A4.03 (3.6/3.4)
Location: In-Plant — 78 ft. and 84 ft. Electrical Penetration / Switchgear Room
Time-Critical: No
Alternate Path: No
Estimated Time: 15 minutes

Initial Conditions:
- A Loss of Offsite Power has occurred on Units 1 and 2.
- The Unit 2 CRS has initiated S2.OP-AB.LOOP-0001, Loss of Offsite Power.

Initiating Cue:
You have been directed to TRANSFER the 22 Backup Group Pressurizer Heaters to the Emergency Power Supply IAW Section 5.3 of S2.OP-SO.PZR-0010, Pressurizer Backup Heaters Power Supply Transfer.
Task Standard:
Transfers the 22 Backup Group Pressurizer heaters to the Emergency Power source by placing 11 of 14 disconnects in OFF, placing the 2EP PZR HTR BUS EMERGENCY FEED DISCONNECT SWITCH in ON, and using the interlock key to unlock breaker 2AX1AX14X.
▶ Show Critical Steps & Key Actions
Step Critical Element Standard
5.3.1 ENSURE 2AX1AX14X, 2EP PRESSURIZER HEATER BUS FEED (EMERGENCY) is OPEN (84 ft. Swgr Rm) Verifies breaker is OPEN.
5.3.2 * Request NCO to PLACE 22 Backup Group in MANUAL and PRESS 22 BACKUP OFF pushbutton Directs NCO to place 22 B/U Group in Manual and PRESS 22 B/U OFF pushbutton.
5.3.3 ENSURE 2EX1EP2EPX, 2EP 480V PRESSURIZER HEATER BUS MAIN BREAKER is OPEN (78 ft. Electrical Penetration) Verifies breaker is OPEN.
5.3.4 * REMOVE interlock key from breaker 2EX1EP2EPX Operator simulates removing interlock key from breaker.
5.3.5 * PLACE any eleven (11) of the following disconnects in OFF (only three disconnects are to remain ON): 2EX1EP1X through 2EX1EP14X, PZR HTR B/U GRP 22 Operator selects three (3) disconnects to remain ON and PLACES eleven (11) disconnects to OFF position. This limits the heater load to stay within the 460V Vital Bus capacity.
5.3.6 * PLACE 2AX1AX14X-1, 2EP PZR HTR BUS EMERGENCY FEED DISCONNECT SWITCH in the ON position (Elev. 78 ft. Electrical Penetration) using JAM Key to unlock Simulates using JAM Key to unlock disconnect AND then placing the disconnect switch to the ON position.
5.3.7 * INSERT interlock key AND UNLOCK breaker 2AX1AX14X Operator simulates inserting key into breaker and then rotating to unlock the breaker.
5.3.8 NOTIFY NCO that PZR Htr 22 B/U Group has been transferred to the emergency power supply (2A 460V Vital Bus) NCO is notified that 22 B/U Group is transferred to the emergency power supply.
Key Decision Point:
Steps 5.3.5 and 5.3.6 are the discriminating steps. The applicant must correctly place 11 of the 14 heater disconnects in OFF (leaving only 3 ON to limit load within the 460V Vital Bus capacity), then use the JAM key to unlock the 2EP PZR HTR BUS EMERGENCY FEED DISCONNECT SWITCH and place it in ON. The sequential interlock key transfer from the main breaker (2EX1EP2EPX) to the emergency feed breaker (2AX1AX14X) ensures proper electrical isolation during the transfer.
Ref: S2.OP-SO.PZR-0010 (R32) | Task: 1130040501 | K/A: 010 A4.03 — Ability to manually operate and/or monitor in the control room: Pressurizer heaters | Source: New | View JPM PDF

Connections