Q98 — Containment Purge Reinstatement
G 2.3.6 (3.8)
Given:
• Unit 2 is in MODE 5.
• A Containment Purge is in progress in accordance with S2.OP-SO.WG-0006, Containment Purge to Plant Vent.
Which ONE of the following completes both statements concerning Containment Purge administrative requirements?
1. A temporary termination of Containment Purge of short duration _(1)_ permitted without the need for a new effluent permit.
2. Reinstatement of Containment Purge must be authorized by the _(2)_.
• Unit 2 is in MODE 5.
• A Containment Purge is in progress in accordance with S2.OP-SO.WG-0006, Containment Purge to Plant Vent.
Which ONE of the following completes both statements concerning Containment Purge administrative requirements?
1. A temporary termination of Containment Purge of short duration _(1)_ permitted without the need for a new effluent permit.
2. Reinstatement of Containment Purge must be authorized by the _(2)_.
A. 1) is
2) RP Supervisor
2) RP Supervisor
B. 1) is
2) Control Room Supervisor
2) Control Room Supervisor
C. 1) is NOT
2) RP Supervisor
2) RP Supervisor
D. 1) is NOT
2) Control Room Supervisor
2) Control Room Supervisor
▶ Show Answer & Explanation
✓ B. Correct. IAW S2.OP-SO.WG-0006, P&L step 3.2, a temporary termination of Containment Purge, without the need for a new effluent permit, is acceptable provided that the temporary termination is of short duration; for example approximately 4 hours, AND there is operational assurance that no radiological changes to the containment environment has occurred. Per Attachment 2, reinstatement of purge requires SM or CRS approval.
✗ A. Part 1 is correct. Part 2 is incorrect. Plausible because Rad Pro Supervision authorizations are required for other activities involving radiation release or exposure.
✗ C. Part 1 is incorrect. Part 2 is incorrect. Plausible because Rad Pro Supervision authorizations are required for other activities involving radiation release or exposure.
✗ D. Part 1 is incorrect. Plausible because the SRO may believe that a new effluent permit will be required anytime the purge is terminated. Part 2 is correct.
Ref: S2.OP-SO.WG-0006 (R30) | LO: None | Source: New | Cognitive: Fundamental/Memory