Exams > 2023 JPM Sim-f — Perform 22 CFCU Surveillance Test IAW S2.OP-ST.CBV-0003

2023 JPM Sim-f — Perform 22 CFCU Surveillance Test IAW S2.OP-ST.CBV-0003

⚠️ DRAFT
JPM Sim-f — Perform 22 CFCU Surveillance Test IAW S2.OP-ST.CBV-0003 Sim | RO/SRO | A1.04 (3.3)
Location: Simulator
Time-Critical: No
Alternate Path: No
Estimated Time: 10 minutes

Initial Conditions:
- Unit 2 is at 100% power.
- No major equipment out of service and no active Tech Specs are in effect.

Initiating Cue:
- You are the Reactor Operator.
- The CRS has directed you to PERFORM a scheduled surveillance test on 22 CFCU IAW S2.OP-ST.CBV-0003, Containment Systems - Cooling Systems.
- All Prerequisites are completed SAT and all required M&TE are installed in the field.
- A field NEO is standing by to provide SW header differential pressure when directed.
- Notify CRS of test results.
Task Standard:
This task is satisfactorily met when the applicant has placed the CFCU in the required test condition IAW step 4.1.2 of S2.OP-SO.CBV-0001, obtained the required test data, and determines 22 CFCU Test Result is UNSAT due to flow obtained being below the minimum flow for current delta P IAW S2.OP-ST.CBV-0003.
▶ Show Critical Steps & Key Actions
Step Critical Element Standard
3.0 P&L 3.4: If measured DP value is between DP values in Exhibit 1, select minimum flow for next higher DP value Reads and initials all P&Ls. Understanding P&L 3.4 is important to properly determining which DP value to choose.
5.1.1.A Ensure CFCU being tested is in LOW SPEED IAW S2.OP-SO.CBV-0001 Goes to S2.OP-SO.CBV-0001 to place CFCU in low speed.
5.1.2.A * Press FAN HIGH SPEED STOP bezel for 22 CFCU Depresses HIGH SPEED STOP bezel for 22 CFCU and verifies STOP bezel illuminates.
5.1.2.B * Ensure FAN STOP bezel is illuminated Verifies HIGH SPEED STOP bezel is illuminated.
5.1.2.C * When 25 seconds have elapsed, press FAN LOW SPEED START bezel Waits 25 seconds from when HIGH SPEED STOP was depressed. Depresses LOW SPEED START bezel for 22 CFCU and verifies START bezel illuminates.
5.1.2.D Ensure dampers are in indicated positions Verifies: ROUGH FLT DAMPER CLOSED bezel extinguished; HEPA INLET DAMPER OPEN bezel illuminated; HEPA OUTLET DAMPER OPEN bezel illuminated.
5.1.2.E If SW flow < 1465 gpm, stop CFCU Determines SW flow > 1465 gpm, marks step N/A and continues.
5.1.2.F Ensure SW flow >= 1465 gpm Verifies SW flow > 1465 gpm. Returns to S2.OP-ST.CBV-0003.
5.1.1.B Record Start Time Records START time in applicable Attachment, Section 3.0.
4.1.11.3 * When at least 15 minutes elapsed, record stop time, SW flow, SW header DP, and determine Test Results Records STOP time. Records SW flow on 22 CFCU (~1785 gpm). Contacts field NEO and records 21 SW Header DP of 106 psi. Determines 22 CFCU is UNSAT/Inoperable because Cooling Water Flow Rate (1785 gpm) is less than the Minimum Flow Rate (1811 gpm) required in Exhibit 1 at SW DP of 110 psi (per P&L 3.4, must use next higher DP value).
Key Decision Point:
Step 4.1.11.3 is the discriminating step — the applicant must correctly apply P&L 3.4: with a measured SW header DP of 106 psi (between 105 and 110), they must select the minimum flow for the next HIGHER DP value (110 psi = 1811 gpm required). Since actual flow is ~1785 gpm, which is less than 1811 gpm, the test result is UNSAT. P&L 3.3 also requires CFCU SW flow rate >= 1465 gpm AND >= Min Flow Rate in Exhibit 1 to be Operable.
Ref: S2.OP-ST.CBV-0003 (R20), S2.OP-SO.CBV-0001 | Task: N0220130201 | System: 022 Containment Cooling System | K/A: A1.04 — Ability to predict and/or monitor changes in parameters associated with operation of the Containment Cooling System: Cooling water flow | Source: Bank | View JPM PDF