SALEM
SALEM STUDY SYSTEM
Exams > 2023 JPM Sim-h — Perform a Containment Pressure Relief

2023 JPM Sim-h — Perform a Containment Pressure Relief

⚠️ DRAFT
JPM Sim-h — Perform a Containment Pressure Relief Sim | RO/SRO | A2.02 (3.0/3.0)
Location: Simulator
Time-Critical: No
Alternate Path: Yes
Estimated Time: 10 minutes

Initial Conditions:
- Salem Unit 2 is at 100% power
- Preparations to perform a containment pressure relief per Section 5.1 of S2.OP-SO.CBV-0002, Containment Pressure - Vacuum Relief System Operation, are complete.

Initiating Cue:
- The CRS directs you to perform a containment pressure relief per Section 5.2 of S2.OP-SO.CBV-0002.
Task Standard:
The task is satisfactorily met when the applicant has placed containment pressure relief in service per step 5.2.3.B of S2.OP-SO.CBV-0002, and upon a high radiation alarm, manually closes 2VC5 and 2VC6 valves to isolate the radiological release from containment per step 5.2.5 of S2.OP-SO.CBV-0002 OR per Attachment 1 of S2.OP-AB.RAD-0001.
▶ Show Critical Steps & Key Actions
Step Critical Element Standard
5.2.2 Record Release Data on Attachment 2, Section 1.0 Records Pressure Relief Start, Initial Containment Pressure, and initial readings on radiation monitors 2R41D (preferred) and 2R12A.
5.2.3.A Monitor available radiation monitors 2R41D and 2R12A Sets up trend on Plant Computer or monitors Radiation Monitors on 2RP1.
5.2.3.B * If containment pressure <0.5 psig, OPEN 2VC6, 2VC5, and PRESSURE RELIEF DAMPER Confirms containment pressure < 0.5 psig. Depresses OPEN bezels for 2VC6, 2VC5, and PRESSURE RELIEF DAMPER on 2CC1 and verifies Red OPEN bezels are LIT.
5.2.4 Record time 2VC5 and 2VC6 are opened in Control Room Narrative Log Extra NCO will record the open time.
5.2.5 * Upon high radiation alarm (OHA A-6 RMS HI RAD OR TRBL on 2R41D), manually CLOSE PRESSURE RELIEF DAMPER, 2VC6, and 2VC5 Depresses CLOSE bezel pushbuttons for PRESSURE RELIEF DAMPER, 2VC6, and 2VC5 and verifies the Green bezels are LIT. (Alternate path — automatic closures have been defeated; applicant must manually close to isolate the release.)
Alternate Procedural Path (S2.OP-AB.RAD-0001):
If the applicant enters S2.OP-AB.RAD-0001 instead of using step 5.2.5 of S2.OP-SO.CBV-0002, the following actions are also acceptable:
Step Action Standard
3.1 Determine affected Radiation Monitor Determines 2R41D is the affected monitor.
3.2 Is the alarm valid? Determines the alarm is VALID.
3.3 Announce on Plant PA system Makes page announcement with affected monitor number, name, and location.
3.4 Direct Shift Rad Pro to complete Station Status Checklist Notifies Rad Pro of actions.
3.5 Notify SM/CRS to refer to ECG, ODCM, Tech Specs Notifies CRS of required actions.
3.6 Initiate applicable attachment for 2R41D Initiates Attachment 1 Step 10.
10.1 * Ensure 2VC1, 2VC4, 2VC5, and 2VC6 are CLOSED Depresses CLOSE bezel pushbuttons for 2VC5 and 2VC6 and verifies Green bezels are LIT.
Key Decision Point:
The alternate path begins when OHA A-6 (RMS HI RAD OR TRBL) alarms due to 2R41D high radiation during the containment pressure relief. The automatic isolation of the pressure relief dampers and 2VC5/2VC6 has been defeated by malfunctions — the applicant must recognize the alarm and manually close 2VC5 and 2VC6 (at minimum) to isolate the radiological release. This can be done via step 5.2.5 of S2.OP-SO.CBV-0002 or via S2.OP-AB.RAD-0001, Attachment 1, Step 10.
Ref: S2.OP-SO.CBV-0002 (R18), S2.OP-AB.RAD-0001 (R30), S2.OP-AR.ZZ-0001 (R60) | Task: N0220080101 | System: 029 Containment Purge System | K/A: A2.02 — Ability to predict the impacts of Adverse environmental conditions affecting radioactive release on the Containment Purge System and use procedures to correct, control, or mitigate the consequences | Source: New | View JPM PDF

Connections