SALEM
SALEM STUDY SYSTEM
Exams > 2023 Q49 — SGBD Radiation Monitor Check Source

2023 Q49 — SGBD Radiation Monitor Check Source

⚠️ DRAFT
Q49 — SGBD Radiation Monitor Check Source T2G1 073 A4.02 (3.6)
Given:
• Salem Unit 1 is at 100% power
• The PO needs to perform a check source on the 1R19A, SGBD Radiation Monitor

Per S1.OP-ST.RM-0001, Radiation Monitors - Check Source, which of the following completes both statements?

1. When the operator pushes the check source pushbutton, the radiation monitor will respond by (1).
2. During the check source, actuation of interlocks (2) expected.
A. (1) a rise in counts until the check source pushbutton is released (2) are
B. (1) a rise in counts until the check source pushbutton is released (2) are NOT
C. (1) a rise in counts then a return to original reading (2) are NOT
D. (1) a rise in counts then a return to original reading (2) are
▶ Show Answer & Explanation
✓ C. Correct. When a check source is performed on this radiation monitor, the counts will rise then return to its previous reading. During check source it is not expected for interlocks to actuate.
✗ A. Incorrect. Plausible because other radiation monitors do perform like this. Incorrect in that this radiation monitor check source the counts rise then fall and interlocks are not expected during check source.
✗ B. Incorrect. Plausible because other radiation monitors do perform like this. Incorrect in that this radiation monitor check source the counts rise then fall and interlocks are not expected during check source.
✗ D. Incorrect. Plausible because some other radiation monitors interlocks could occur during check source.
Ref: NOS05RMS000-20, S1.OP-ST.RM-0001 (R10) | Source: New | Cognitive: Fundamental/Memory
K/A: 073 A4.02 — Ability to manually operate and/or monitor the Process Radiation Monitor in the control room: RMS control panel.

Connections